Tuesday, 11 August 2026
Reference:FA****
Dear Mr/Ms:
This is China Road and Bridge Corporation’s Breice-Granini prijelaz Bregana Expressway Project.
The Croatia PG Expressway project spans from chainage K0+000 to K14+750, with a total length of 14.75 km. The total contract value is approximately €159 million, and the contract period is 48 months. The project scope includes civil engineering works such as roadbed and pavement, bridges, tunnels, protection, drainage, and pipeline relocation.The main works include one tunnel (main tunnel 1650m, service tunnel 1691.6m, total length 3341.6m), two interchanges, four grade-separated intersections, eight mainline bridges (single-lane total length 1244.55m), three overpasses (single-lane total length 331.3m), six underpasses (total length 151.53m, including one 12.51m river crossing), one underpass tunnel (39.95m), 83 circular culverts, and 32 box culverts. The main line is designed with a single-lane width of 3.25m, a roadbed width of 12m, four grade-separated intersections, 23 parallel road relocations totaling 13.336km, 108 side ditches and drainage ditches totaling 22143.5m, and 53 river relocations totaling 9023.78m.
According to the actual construction organization plan of the project, the project team needs to purchase 50 tons of channel steel for retaining wall formwork support. This procurement notice is hereby issued and is valid for 3 days.
| No. | Item Description | Unit | Qty | remark |
| 1 | Channel steel | T | 50 | [12 S235JR 6m |
The requirements are as follows:
Please feel free to contact the person undersigned if you have any questions:
Name: WuBo
E-mail address:****@crbc-croatia.com
Annexures:none
We are expecting to receive your best quotation . Please attach the quotation sheet with your company qualification information(include but not limited BROAD-BASED BLACK ECONOMIC EMPOWERMENT ) and account informations.
Your prompt response will be highly appreciated.
Thanks and best regards.
| 序号 | 附件名称 | 附件说明 | 操作 |
|---|
| 1 | 采购公告.pdf | | 下载 预览 |
| 序号 | 设备物资名称 | 设备物资说明 | 税率 | 单位 |
|---|
| 1 | 热轧普通槽钢 Q235AZ 40a | | 25% | 吨 |
当前位置:









