项目概况: | Project Name: Engineering, Procurement and Construction (EPC) for New Nassiriya Depot Owner: State Company for Oil Project (SCOP) Nassiriya New Crude Oil Depot with a working capacity of about four million barrels (637,000 M3) is the proposed depot to accommodate the produced crude from the following fields: Ahdeb Field, Badra Field, Gharaffield, Nassiriya field and Abu Amood field. Total capacity shall be about four million barrels (637,000 M3), for Phase (I) it shall be 2.52 million barrels (401,000 M3), and for Phase (II), it shall be 1.26 million barrels (200,500 M3).CPP win to build all tanks for phase (I), including 7 Floating roof tanks (66000m3), and their accessories. Two relief tanks(23000 m3), capacity of each tank is 23000 m3 , one for heavy the other for light crude oil .Two fire water steel tank of 10,000 m3 Capacity from continuous water supply. The project is planned to be completed prior January, 2026. |